INSTALLATION AND INSTRUCTIONS FOR ADJUSTING GRAVITY OIL DRAW-OFF

When the Interceptor is completely installed, establish operating water line by running water thru interceptor at maximum flow rate. Mark or locate this operating water line and adjust tubing 1/8" above this line as shown in Detail "A". Adjustment should be checked after Interceptor is in operation. If water is present in oil removed through gravity draw-off, adjustable brass tube should be raised slightly, until no water is present.

 Installation Example
Approved by N.Y. Board of Standards and Appeals No. 935253-SM

  Interceptor Section Index   Technical Data Index   Go Back   Go Forward