FUNCTION: The all steel receiving cradle provides positive support for the interceptor and vertical adjustability for the inlet and
outlet connections to meet the drainage piping. The receiving cradle can be set in the slab at the time of pouring or set in a
pre-sleeved opening in the rough slab. The cradle is secured and suspended in the rough slab by its anchoring flange. The
semi-automatic draw-off type grease interceptor is lowered into the receiver cradle and adjusted to the elevation of the drainage
piping. The interceptor, line shut-off valve and flexible grease draw-off hose are readily accessible for cleaning and inspection
simply by removing the cradle cover which sits flush with the floor. The cradle supports the interceptor and has no provisions for
waterproofing the interceptor in relation to the cradle and ceiling below. |
|