ROUGHING OF VERTICAL ADJUSTABLE FITTINGS WITH SIDE INLETS
Vertical Adjustable Fittings with Side Inlets
Siphon Jet-The location of the side inlet is determined by the center of the closet outlet to the finished floor plus the thickness of the finished floor materials. This will determine where the inlet will be in relation to the rough floor. For shallow roughing (0200 Series) or one-pour slab construction, the side inlet should always set on the slab floor.

Blowout-The location of the side inlet should be set in the lowest position from center line of the closet outlet to center line of side inlet.