Siphon
Jet-The location of the side inlet is determined by the center
of the closet outlet to the finished floor plus the thickness of the finished
floor materials. This will determine where the inlet will be in relation
to the rough floor. For shallow roughing (0200 Series) or one-pour slab
construction, the side inlet should always set on the slab floor.
Blowout-The location of the side inlet should be set
in the lowest position from center line of the closet outlet to center
line of side inlet. |